A glue down installation requires premium wood adhesives be properly troweled over the concrete slab and the engineered wood planks laid onto the adhesive and locked together at their tongue and groove joints.
Engineered floor glue concrete.
Also concrete slab should be constructed with the appropriate moisture barricade.
How are they installed.
Applications are more prominent with residential construction in sunbelt areas commercial locations and high rise dwellings.
Foot traffic should be restricted on the newly installed floor for 16 24 hours.
When working on a clean concrete subfloor the glue down method is often the go to choice.
Once you have finished installing your engineered wood use a 100 150 lb.
The adhesive manufacturer should have instructions regarding specific trowel requirements.
Thank you for your inquiry.
A glue down installation requires premium wood adhesives to be properly troweled over the concrete slab.
Wood adhesives recommended today are much more environmentally friendly than in the past but they cost more.
Wide over concrete slab provided moisture readings in the slab are within tolerances of the adhesive and wood floor manufacturer.
The glue down method of engineered wood flooring installation is typically the most common and creates a highly stable floor.
Roller to make sure that the adhesive fully transfers to the engineered wood floor and the concrete.
Roberts 1407 is recommended for the installation of engineered wood flooring up 1 2 thick amp.