Yes since engineered wood flooring is constructed from natural hardwood it requires acclimation.
Engineered flooring acclimation period.
However when a wood subfloor is used you must account for possible expansion and contraction of the subfloor.
When discussing delivery and installation dates with clients they are almost always under the impression that the wood flooring must sit in their home before installation.
I inspect a lot of flooring complaints and fill out a lot of manufacturer required forms.
Handle and unload hardwood flooring with care and store within the environmentally controlled site in which it is expected to perform.
If the manufacturer recommends the wood flooring be acclimated before installation proceed as follows.
Allow wood flooring to acclimate for at least three days.
Acclimation hardwood floors how long.
While it s not as important for our engineered hardwoods due to the stability in the way they are constructed solids will expand and contract considerably given the right conditions with wide changes in relative humidity levels.
This is an.
Acclimation to the installation environment for solid wood floors should never be overlooked.
Some engineered flooring manufacturers recommend acclimation while others do not.
Wood floor acclimation with engineered flooring.
Engineered hardwood wood subfloor engineered hardwood is more dimensionally stable than solid so it doesn t usually need to be acclimated to the same extent as solid hardwood.
Acclimation times vary by species and product but a rule of thumb is to acclimate wood floor products for at least three days.
3 days of acclimation is recommended for engineered flooring.
The planks can remain in the box with the ends cut open for the duration of the acclimation period.
The period within which you will acclimate your floor depends on various factors such as the material of your ideal flooring geographic location current temperatures and humidity and expected climate changes.
The only way to achieve this is through acclimation.
Maintaining the recommended acclimation levels after the installation will minimize board movement excessive squeaks and gaps.
With some products you may have problems engaging the tongue and groove if it is acclimated to a higher moisture content.
There are all different answers from 5 days to 2 weeks or more.
We ve all heard someone in the flooring industry say the wood flooring must sit in the home to acclimate for a period of time before installation.
Even with engineered flooring it is suggested by some manufacturers that in order to retain coverage with the warranty the job site has to be maintained between 30 50 relative humidity and these conditions must also be maintained after installation.
Best practices for acclimating wood flooring.